challenge
Belk has a long-tenured history with Atlas. When it came time to re-image all of their locations, Belk turned to Atlas.
solution
The beginning-to-end process includes:
- Survey
- Site plan review
- Code check
- Permitting
- Design
- Manufacturing
- Installation
- Punchlist
- Close-out
result
Atlas completed all 340 stores in 52 weeks, on time and on budget.