challenge

Belk has a long-tenured history with Atlas. When it came time to re-image all of their locations, Belk turned to Atlas.

solution

The beginning-to-end process includes:

  • Survey
  • Site plan review
  • Code check
  • Permitting
  • Design
  • Manufacturing
  • Installation
  • Punchlist
  • Close-out

result

Atlas completed all 340 stores in 52 weeks, on time and on budget.